Cutler Bay, FL · Miami-Dade County

Shed Permit Checklist

Checklist of required documents and fees for obtaining a shed permit in Cutler Bay, including survey, site plan, and owner-builder affidavit requirements.

What this form is

This checklist outlines all materials needed to submit a complete shed permit application to the Town of Cutler Bay Building Division. Requirements vary based on whether the shed is site-built or pre-fabricated, and include proof of ownership, property surveys less than six months old, site plans with setback information, and an owner-builder affidavit if the owner is performing the work themselves. An up-front review fee of $130 is required.

Who needs it

Homeowners in Cutler Bay planning to build or install a shed on their property, whether doing the work themselves or hiring a contractor.

Why it needs a notary

The owner-builder affidavit included in this permit package must be notarized to verify the property owner's identity and confirm their intent to perform the construction work themselves rather than hiring a licensed contractor.

Preview the form

The blank PDF straight from Cutler Bay. Look it over, then upload your filled copy to start the notary session.

Info

You’ll need ID and a webcam.

A licensed Florida online notary will join you on video, verify your government-issued ID, witness your signature, and apply their seal. You’ll receive the notarized PDF by email when the session ends.

Ready to notarize your Shed Permit Checklist?

Drop your email below — we’ll hand you straight to a licensed notary in the next session.